Control Tower Flow with Workaround

The flow of my bot tasks are not synchronising. I have 3 bot tasks that are using data from export and for example the first bot task will loop through all the records before going to the next bot task. It not making the whole flow then going to the next record. Can you please help me?

@ajoyram how do you need the process to be executed? Do you need the 1st bot task to be executed for each record and then move to 2nd bot task?

Basically I want to make the flow as shown in the image. I want the flow to go from bot task 1 to bot task 3 for one record, then loop. Is this possible?
Thanks